{"id":4500,"date":"2021-11-18T01:50:35","date_gmt":"2021-11-18T01:50:35","guid":{"rendered":"https:\/\/ancg.vn\/?page_id=4500"},"modified":"2021-11-18T02:51:18","modified_gmt":"2021-11-18T02:51:18","slug":"construction-buiding","status":"publish","type":"page","link":"https:\/\/ancg.vn\/en\/construction-buiding\/","title":{"rendered":"Construction – Building"},"content":{"rendered":"\t\t
\n\t\t\t\t\t\t\t
\n\t\t\t\t\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t
<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\"\"\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
<\/div>\n\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t

Building Construction Process Start To Finish<\/h3>\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t\t\t\t

Following are the Steps Involved in Building Construction Process from Start to Finish<\/em><\/strong><\/p>\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t

\n\t\t\t
\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t\t\t\t\t\t\t\t
\n\t\t\t\t\t\t\t\t\t\t\"\"\t\t\t\t\t\t\t\t\t\t\t
CP Ninh Thuan Factory ( A&C Construction )<\/figcaption>\n\t\t\t\t\t\t\t\t\t\t<\/figure>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t

Pre-Construction Steps (Phase \u2013 I)<\/h2>\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t\t\t\t
1.\u00a0<\/span>To Acquire Land or Plot<\/span><\/strong><\/h6>

It is the most important step in\u00a0building construction<\/strong>. Search for the\u00a0location\u00a0<\/strong>for the building which is\u00a0best suited<\/strong>\u00a0for building\u00a0construction purpose<\/strong>s. Be careful while\u00a0selecting<\/strong>\u00a0land\u00a0<\/strong>which has all the desired\u00a0facilities\u00a0<\/strong>available nearby and should be free from all\u00a0land-related issues.<\/strong><\/p>

It is suggested that do prior\u00a0data collection<\/strong>\u00a0before buying\u00a0land\u00a0<\/strong>or\u00a0plot\u00a0<\/strong>either by doing research online or seeking help from\u00a0real estate agents<\/strong>\u00a0or concerned persons regarding the\u00a0effective cost<\/strong>\u00a0of the same.<\/p>

2.\u00a0<\/span>To\u00a0Seek Technical Help<\/span><\/strong><\/h6>

After selecting proper land for building, take the help of a\u00a0professional architect\u00a0<\/strong>to create\u00a0building designs\u00a0<\/strong>and take his\/her advice. An\u00a0architect\u00a0<\/strong>prepare plan as per building requirement, number of flats, shops based on your requirements and budget.<\/p>

Then after architect consult with a\u00a0structural engineer<\/strong>\u00a0for details of the\u00a0reinforcements\u00a0to be used, how deep your foundation will be, the size of gravel to be used, pillar\u00a0width<\/strong>, etc.<\/p>

3.<\/span>Preparing Estimate and Budget<\/span><\/strong><\/h6>

Building construction involves a huge amount of material and budget. After, planning and\u00a0structural detailing<\/strong>\u00a0have been completed these details are transferred to the\u00a0building estimator. The building estimator will estimate the material quantity, quantity of different\u00a0items of work<\/strong>, and prepare an\u00a0abstract sheet\u00a0<\/strong>that shows the cost of building construction.<\/p>

If\u00a0financial res<\/strong>ources are limited, we need to seek pre-approval for loans in advance, or else you may end up in a\u00a0cash crunch situation<\/strong>.<\/p>

<\/span>4.\u00a0<\/span>Permission from Authorities<\/span><\/strong><\/h6>

This is important work to do after the\u00a0project\u00a0<\/strong>is ready to be\u00a0executed<\/strong>. For that, we have to take permission from the\u00a0<\/strong>local\u00a0municipal body<\/strong>\u00a0before you could\u00a0go for the construction.<\/strong><\/p>

Following are the list of\u00a0document project<\/strong>\u00a0required before applying for permission. This document may differ from\u00a0state to state,<\/strong>\u00a0but some are essential for every building construction work.<\/p>

a)\u00a0Land survey:\u00a0Survey<\/strong>\u00a0of the land has to be carried out with the help of authorized land surveyor<\/p>

b)\u00a0Soil test<\/strong>\u00a0report of the land.<\/p>

c)\u00a0Land documents<\/strong>.<\/p>

d)\u00a0Architecture<\/strong>\/ elevation\/ sectional drawings.<\/p>

e)\u00a0Structural report.<\/strong><\/p>

f) \u00a0Architect Certificate<\/strong>\u00a0of undertaking on Record and Certificate of the undertaking of Civil Engineer on Record<\/p>

5.\u00a0<\/span>Approach a Builder<\/span><\/strong><\/h6>

A\u00a0builder\u00a0<\/strong>or\u00a0contractor\u00a0<\/strong>for construction must be chosen carefully because it is a major factor for\u00a0securing building\u00a0<\/strong>construction quality and\u00a0timely construction<\/strong>\u00a0of work.\u00a0Pre investigation<\/strong>\u00a0must be done about the builder before handing in work. In the\u00a0contract document,\u00a0all the work-related details must be clearly stated.<\/p>

The\u00a0contract document<\/strong>\u00a0should cover layout and work details along with the payment methods, time scales, and costs. The condition of the\u00a0contract\u00a0should be thoroughly checked before signing a final deal.<\/p>\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t

\n\t\t\t
\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t

Building Construction Step (Phase \u2013 II)<\/h2>\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t\t\t\t
1.\u00a0<\/span>Site Preparation or Leveling<\/span><\/strong><\/h6>

The\u00a0construction site<\/strong>\u00a0must be cleaned before the work is executed. This work involves the removal of\u00a0roots of trees, debris,\u00a0<\/strong>and\u00a0leveling ground area.<\/strong><\/p>

<\/span>2.\u00a0<\/span>Excavation and PCC<\/span><\/strong><\/h6>

The foundation<\/strong>\u00a0of the building ground is excavated with the help of\u00a0excavating machines<\/strong>\u00a0as per the building dimension specified in the drawings. In this foundation trench, a layer of\u00a0PCC (Plain cement concrete)\u00a0<\/strong>is laid in the dug portion before placing the reinforcements for the\u00a0foundation<\/strong>.<\/p>\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t

\n\t\t\t\t
\n\t\t\t\t\t\t\t\t\t\t\t\t
\n\t\t\t\t\t\t\t\t\t\t\"\"\t\t\t\t\t\t\t\t\t\t\t
Ground filling Ben Tre ( A&C Construction )<\/figcaption>\n\t\t\t\t\t\t\t\t\t\t<\/figure>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t\t\t\t

\u00a0<\/p>

3.\u00a0<\/span>Foundation<\/span><\/strong><\/h6>

The\u00a0building\u00a0<\/strong>is supported on the\u00a0foundation\u00a0<\/strong>is the lowermost part of the building that is in contact with the soil. A building is\u00a0load transferred<\/strong>\u00a0from the\u00a0superstructure\u00a0<\/strong>to the soil and needs to be extremely strong to handle the load.<\/p>

After the\u00a0PCC\u00a0work foundation reinforcement work is started. The foundation bottom level must check before\u00a0concreting\u00a0<\/strong>it. The remaining space between the\u00a0foundation\u00a0<\/strong>is filled with earth.<\/p>\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t

\n\t\t\t
\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t\t\t\t\t\t\t\t
\n\t\t\t\t\t\t\t\t\t\t\"\"\t\t\t\t\t\t\t\t\t\t\t
Project Dream Foundation ( A&C Construction )<\/figcaption>\n\t\t\t\t\t\t\t\t\t\t<\/figure>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t\t\t\t
4.\u00a0<\/span>Plinth Beam and Slab<\/span><\/strong><\/h6>

After the\u00a0foundation work\u00a0<\/strong>is done ground beam\u00a0formwork\u00a0preparation is started and poured with concrete. Over the\u00a0plinth beam,\u00a0<\/strong>masonry work is started. And space between foundation and plinth beam filled with soil.<\/p>\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t

\n\t\t\t
\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t\t\t\t\t\t\t\t
\n\t\t\t\t\t\t\t\t\t\t\"\"\t\t\t\t\t\t\t\t\t\t\t
Jail Vina Beam ( A&C Construction ) <\/figcaption>\n\t\t\t\t\t\t\t\t\t\t<\/figure>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t\t\t\t
5.\u00a0<\/span>Superstructure \u2013 Column<\/span><\/strong><\/h6>

The\u00a0superstructure\u00a0<\/strong>is the portion above the plinth level of the building. The main\u00a0component of the superstructure<\/strong>\u00a0is a column and beam.\u00a0 The columns are built up to slab level and the frame for further construction is prepared.<\/p>

6.\u00a0Brick<\/strong>\u00a0<\/span>Masonry Work<\/span><\/strong><\/h6>

As\u00a0column\u00a0<\/strong>and beam framework completed masonry work is started with different materials such as\u00a0bricks, concrete blocks,<\/strong>\u00a0fly ash bricks<\/strong>, etc. according to building drawing. Masonry work is done using a\u00a0cement mortar mix.<\/strong>\u00a0It is a mixture of\u00a0cement<\/strong>\u00a0&\u00a0sand<\/strong>. During this carefully and as per drawing gaps are laid for doors and windows during the\u00a0masonry work<\/strong>.<\/p>

7.\u00a0<\/span>The Lintel Over Door Window Gaps<\/span><\/strong><\/h6>

The\u00a0lintel\u00a0<\/strong>is constructed on the\u00a0door\u00a0<\/strong>and\u00a0window\u00a0<\/strong>to support the\u00a0masonry work<\/strong>\u00a0over it. After this further masonry work is done<\/p>

8.<\/span>\u00a0Floor Slab or Roof Structure<\/span><\/strong><\/h6>

Then the\u00a0formwork\u00a0<\/strong>is started to construct slab resting on the column and beam. Over\u00a0slab formwork<\/strong>, slab\u00a0reinforcement\u00a0<\/strong>is placed as per slab detailed drawing.<\/p>\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t

\n\t\t\t
\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t\t\t\t\t\t\t\t
\n\t\t\t\t\t\t\t\t\t\t\"\"\t\t\t\t\t\t\t\t\t\t\t
Dream Project Roof Structure ( A&C Construction)<\/figcaption>\n\t\t\t\t\t\t\t\t\t\t<\/figure>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t\t\t\t
9.\u00a0<\/span><\/span>Door Window Framing and Fixations<\/span><\/span><\/strong><\/h6>

After that door\u00a0window frames<\/strong>\u00a0are fixed at their specified position given in the\u00a0drawing.<\/p>

10.\u00a0<\/span>Electrical and Plumbing<\/span><\/strong><\/h6>

As we know that\u00a0buildings\u00a0<\/strong>are constructed with a clean finish in which\u00a0electrical\u00a0<\/strong>and\u00a0plumbing work<\/strong>\u00a0is not visible. They are installed in the walls and slabs such that they are concealed and not visible after the\u00a0finishing work<\/strong>\u00a0is done. The\u00a0point\u00a0<\/strong>and\u00a0pipe\u00a0<\/strong>ends are left out such that later they can be finished with the electric fitting and\u00a0plumbing fixtures.<\/p>

11.\u00a0<\/span>Exterior Finishing<\/span><\/strong><\/h6>

Once this work is completed,\u00a0<\/strong>external plastering and\u00a0finishing work<\/strong>\u00a0is started.\u00a0Waterproofing\u00a0<\/strong>is also done to prevent rising\u00a0dampness<\/strong>\u00a0in the wall. External cladding can also be done to enhance the elevation of the house.<\/p>

<\/span>12.\u00a0<\/span><\/span>Terrace and Roof Finishing<\/span><\/span><\/strong><\/h6>

On top of the slab,\u00a0waterproofing<\/strong>\u00a0is done to prevent any\u00a0leakage\u00a0<\/strong>in the slab. Generally,\u00a0terrazzo tiling\u00a0<\/strong>is done to prevent the slab from a weathering effect.<\/p>

<\/span>13.\u00a0<\/span>Internal Finishing<\/span><\/strong><\/h6>

Internal walls<\/strong>\u00a0are\u00a0plaster\u00a0<\/strong>with a smooth finish and flooring is done with tiles. Later on, the walls are\u00a0painted\u00a0<\/strong>or\u00a0textured<\/strong>.<\/p>

<\/span>14.\u00a0<\/span>Woodwork and Fixture Fittings<\/span><\/strong><\/h6>

By following the above step, almost all\u00a0construction work\u00a0<\/strong>is completed, and then after\u00a0furniture<\/strong>\u00a0work is started. Side by side,\u00a0electrical fitting<\/strong>, switchboard, and plumbing fittings are complete in the bathrooms and kitchen areas too.<\/p>

<\/span>15.\u00a0<\/span>Waterproofing<\/span><\/strong><\/h6>

Waterproofing<\/strong>\u00a0is a method that\u00a0prevents water\u00a0<\/strong>from\u00a0penetrating your hous<\/strong>e.\u00a0Waterproofing<\/strong>\u00a0is very important as it\u00a0helps keep your house dry<\/strong>. It helps\u00a0reduce humidity\u00a0<\/strong>inside the house and\u00a0thereby protects thing<\/strong>s inside your house from\u00a0damage<\/strong>\u00a0caused due to humidity or\u00a0water exposure<\/strong><\/p>

<\/span>16.\u00a0<\/span>Painting Work<\/span><\/strong><\/h6>

The\u00a0most importan<\/strong>t purpose of\u00a0house painting<\/strong>\u00a0is to give our\u00a0house a long life<\/strong>\u00a0and adding\u00a0colours\u00a0<\/strong>on it is to give our\u00a0house a beautiful<\/strong>\u00a0makeover.\u00a0The\u00a0painting work<\/strong>\u00a0not only add colours to\u00a0house walls<\/strong>\u00a0but to\u00a0protect their house<\/strong>\u00a0from all\u00a0stain and dirt<\/strong>\u00a0and give their house a\u00a0long life<\/strong>, however, walls have a way of\u00a0finding some stain.<\/strong><\/p>

There are various\u00a0paint qualities<\/strong>\u00a0which can be\u00a0used to pro<\/strong>tect our house for a\u00a0long time\u00a0<\/strong>from\u00a0stain, mud, sunlight,<\/strong>\u00a0rain, dirt etc. from basic\u00a0paint to\u00a0high-qualit<\/strong>y paint\u00a0which can give our house\u00a05 to 10 years of extra life<\/strong>\u00a0and amazing look for\u00a0exterior and interior as well<\/strong>.<\/p>\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t

\n\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t\n\t\t\t\t\t\t<\/span>\n\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
\n\t\t\t\t
\n\t\t\t

Watch Video: Building Construction Process With 3D Model<\/h2>\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
<\/div>\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t\n\t\t\t\t\t\t<\/span>\n\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
\n\t\t\t\t
\n\t\t\t
More Projects :<\/a><\/h6>\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t\n\t\t\t\t\t\t<\/span>\n\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t\t\t\t\t\t\t\t
\n\t\t\t\t\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t\t\t\t\t\t<\/a>\n\t\t\t\t\t\t\t\t\t\t\t
Chicken Farm BInh Phuoc ( A&C Construction )<\/figcaption>\n\t\t\t\t\t\t\t\t\t\t<\/figure>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
<\/div>\n\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t\t\t\t\t\t\t\t
\n\t\t\t\t\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t\t\t\t\t\t<\/a>\n\t\t\t\t\t\t\t\t\t\t\t
Doosan Office ( A&C Construction )<\/figcaption>\n\t\t\t\t\t\t\t\t\t\t<\/figure>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
<\/div>\n\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t

COMPANY INFORMATION<\/h2>\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
\n\t\t\t\t\t\t\t
<\/div>\n\t\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t
Company Name <\/div>\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\tA&C CONSTRUCTION JOINT STOCK COMPANY<\/span>\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t
\n\t\t\t\t\t\t\t
<\/div>\n\t\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t
Address<\/div>\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t112 Mai Thi Luu Street, Da Kao Ward, District 1, Hochiminh City.<\/span>\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t
\n\t\t\t\t\t\t\t
<\/div>\n\t\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t
Telephone<\/div>\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t028.6291.0805-06\/ 6291 0806 Fax: 028 62910804<\/span>\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t
\n\t\t\t\t\t\t\t
<\/div>\n\t\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t
Email<\/div>\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\tcontact@ancg.vn<\/span>\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t
\n\t\t\t\t\t\t\t
<\/div>\n\t\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t
Tax code<\/div>\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t0302861213<\/span>\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t
\n\t\t\t\t\t\t\t
<\/div>\n\t\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t
Incorporation Date<\/div>\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\tFeb 10th, 2003 with Business License\nNo.4103001445 issued by HCMC IAPD<\/span>\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t
\n\t\t\t\t\t\t\t
<\/div>\n\t\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t
Bank account<\/div>\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t31510000782223 at BIDV Phu Nhuan branch, HCM city.<\/span>\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"

Building Construction Process Start To Finish Following are the Steps Involved in Building Construction Process from Start to Finish CP Ninh Thuan Factory ( A&C Construction ) Pre-Construction Steps (Phase \u2013 I) 1.\u00a0To Acquire Land or Plot It is the most important step in\u00a0building construction. Search for the\u00a0location\u00a0for the building which is\u00a0best suited\u00a0for building\u00a0construction purposes. […]<\/p>\n","protected":false},"author":2,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"elementor_header_footer","meta":[],"yoast_head":"\nConstruction - Building - A&C CONSTRUCTION | X\u00e2y D\u1ef1ng - Thi\u1ebft K\u1ebf - Gi\u00e1m S\u00e1t<\/title>\n<meta name=\"description\" content=\"C\u00f4ng ty c\u1ed5 ph\u1ea7n x\u00e2y d\u1ef1ng A&C\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/ancg.vn\/en\/construction-buiding\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Construction - Building - A&C CONSTRUCTION | X\u00e2y D\u1ef1ng - Thi\u1ebft K\u1ebf - Gi\u00e1m S\u00e1t\" \/>\n<meta property=\"og:description\" content=\"C\u00f4ng ty c\u1ed5 ph\u1ea7n x\u00e2y d\u1ef1ng A&C\" \/>\n<meta property=\"og:url\" content=\"https:\/\/ancg.vn\/en\/construction-buiding\/\" \/>\n<meta property=\"og:site_name\" content=\"A&C CONSTRUCTION | X\u00e2y D\u1ef1ng - Thi\u1ebft K\u1ebf - Gi\u00e1m S\u00e1t\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/xaydunganc\" \/>\n<meta property=\"article:modified_time\" content=\"2021-11-18T02:51:18+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/ancg.vn\/wp-content\/uploads\/2021\/05\/chi-tiet-linh-vuc.jpg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"8 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Organization\",\"@id\":\"https:\/\/ancg.vn\/#organization\",\"name\":\"A&C Construction\",\"url\":\"https:\/\/ancg.vn\/\",\"sameAs\":[\"https:\/\/www.facebook.com\/xaydunganc\"],\"logo\":{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/ancg.vn\/#logo\",\"inLanguage\":\"en-US\",\"url\":\"https:\/\/ancg.vn\/wp-content\/uploads\/2021\/12\/LOGO-AC-SHOP.png\",\"contentUrl\":\"https:\/\/ancg.vn\/wp-content\/uploads\/2021\/12\/LOGO-AC-SHOP.png\",\"width\":3937,\"height\":984,\"caption\":\"A&C Construction\"},\"image\":{\"@id\":\"https:\/\/ancg.vn\/#logo\"}},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/ancg.vn\/#website\",\"url\":\"https:\/\/ancg.vn\/\",\"name\":\"A&C CONSTRUCTION | X\\u00e2y D\\u1ef1ng - Thi\\u1ebft K\\u1ebf - Gi\\u00e1m S\\u00e1t\",\"description\":\"C\\u00d4NG TY C\\u1ed4 PH\\u1ea6N X\\u00c2Y D\\u1ef0NG A&C\",\"publisher\":{\"@id\":\"https:\/\/ancg.vn\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/ancg.vn\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/ancg.vn\/en\/construction-buiding\/#primaryimage\",\"inLanguage\":\"en-US\",\"url\":\"https:\/\/ancg.vn\/wp-content\/uploads\/2021\/05\/chi-tiet-linh-vuc.jpg\",\"contentUrl\":\"https:\/\/ancg.vn\/wp-content\/uploads\/2021\/05\/chi-tiet-linh-vuc.jpg\",\"width\":1650,\"height\":659},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/ancg.vn\/en\/construction-buiding\/#webpage\",\"url\":\"https:\/\/ancg.vn\/en\/construction-buiding\/\",\"name\":\"Construction - Building - A&C CONSTRUCTION | X\\u00e2y D\\u1ef1ng - Thi\\u1ebft K\\u1ebf - Gi\\u00e1m S\\u00e1t\",\"isPartOf\":{\"@id\":\"https:\/\/ancg.vn\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/ancg.vn\/en\/construction-buiding\/#primaryimage\"},\"datePublished\":\"2021-11-18T01:50:35+00:00\",\"dateModified\":\"2021-11-18T02:51:18+00:00\",\"description\":\"C\\u00f4ng ty c\\u1ed5 ph\\u1ea7n x\\u00e2y d\\u1ef1ng A&C\",\"breadcrumb\":{\"@id\":\"https:\/\/ancg.vn\/en\/construction-buiding\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/ancg.vn\/en\/construction-buiding\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/ancg.vn\/en\/construction-buiding\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/ancg.vn\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Construction – Building\"}]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Construction - Building - A&C CONSTRUCTION | X\u00e2y D\u1ef1ng - Thi\u1ebft K\u1ebf - Gi\u00e1m S\u00e1t","description":"C\u00f4ng ty c\u1ed5 ph\u1ea7n x\u00e2y d\u1ef1ng A&C","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/ancg.vn\/en\/construction-buiding\/","og_locale":"en_US","og_type":"article","og_title":"Construction - Building - A&C CONSTRUCTION | X\u00e2y D\u1ef1ng - Thi\u1ebft K\u1ebf - Gi\u00e1m S\u00e1t","og_description":"C\u00f4ng ty c\u1ed5 ph\u1ea7n x\u00e2y d\u1ef1ng A&C","og_url":"https:\/\/ancg.vn\/en\/construction-buiding\/","og_site_name":"A&C CONSTRUCTION | X\u00e2y D\u1ef1ng - Thi\u1ebft K\u1ebf - Gi\u00e1m S\u00e1t","article_publisher":"https:\/\/www.facebook.com\/xaydunganc","article_modified_time":"2021-11-18T02:51:18+00:00","og_image":[{"url":"https:\/\/ancg.vn\/wp-content\/uploads\/2021\/05\/chi-tiet-linh-vuc.jpg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"8 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Organization","@id":"https:\/\/ancg.vn\/#organization","name":"A&C Construction","url":"https:\/\/ancg.vn\/","sameAs":["https:\/\/www.facebook.com\/xaydunganc"],"logo":{"@type":"ImageObject","@id":"https:\/\/ancg.vn\/#logo","inLanguage":"en-US","url":"https:\/\/ancg.vn\/wp-content\/uploads\/2021\/12\/LOGO-AC-SHOP.png","contentUrl":"https:\/\/ancg.vn\/wp-content\/uploads\/2021\/12\/LOGO-AC-SHOP.png","width":3937,"height":984,"caption":"A&C Construction"},"image":{"@id":"https:\/\/ancg.vn\/#logo"}},{"@type":"WebSite","@id":"https:\/\/ancg.vn\/#website","url":"https:\/\/ancg.vn\/","name":"A&C CONSTRUCTION | X\u00e2y D\u1ef1ng - Thi\u1ebft K\u1ebf - Gi\u00e1m S\u00e1t","description":"C\u00d4NG TY C\u1ed4 PH\u1ea6N X\u00c2Y D\u1ef0NG A&C","publisher":{"@id":"https:\/\/ancg.vn\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/ancg.vn\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"ImageObject","@id":"https:\/\/ancg.vn\/en\/construction-buiding\/#primaryimage","inLanguage":"en-US","url":"https:\/\/ancg.vn\/wp-content\/uploads\/2021\/05\/chi-tiet-linh-vuc.jpg","contentUrl":"https:\/\/ancg.vn\/wp-content\/uploads\/2021\/05\/chi-tiet-linh-vuc.jpg","width":1650,"height":659},{"@type":"WebPage","@id":"https:\/\/ancg.vn\/en\/construction-buiding\/#webpage","url":"https:\/\/ancg.vn\/en\/construction-buiding\/","name":"Construction - Building - A&C CONSTRUCTION | X\u00e2y D\u1ef1ng - Thi\u1ebft K\u1ebf - Gi\u00e1m S\u00e1t","isPartOf":{"@id":"https:\/\/ancg.vn\/#website"},"primaryImageOfPage":{"@id":"https:\/\/ancg.vn\/en\/construction-buiding\/#primaryimage"},"datePublished":"2021-11-18T01:50:35+00:00","dateModified":"2021-11-18T02:51:18+00:00","description":"C\u00f4ng ty c\u1ed5 ph\u1ea7n x\u00e2y d\u1ef1ng A&C","breadcrumb":{"@id":"https:\/\/ancg.vn\/en\/construction-buiding\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/ancg.vn\/en\/construction-buiding\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/ancg.vn\/en\/construction-buiding\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/ancg.vn\/en\/"},{"@type":"ListItem","position":2,"name":"Construction – Building"}]}]}},"_links":{"self":[{"href":"https:\/\/ancg.vn\/en\/wp-json\/wp\/v2\/pages\/4500"}],"collection":[{"href":"https:\/\/ancg.vn\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/ancg.vn\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/ancg.vn\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/ancg.vn\/en\/wp-json\/wp\/v2\/comments?post=4500"}],"version-history":[{"count":7,"href":"https:\/\/ancg.vn\/en\/wp-json\/wp\/v2\/pages\/4500\/revisions"}],"predecessor-version":[{"id":4508,"href":"https:\/\/ancg.vn\/en\/wp-json\/wp\/v2\/pages\/4500\/revisions\/4508"}],"wp:attachment":[{"href":"https:\/\/ancg.vn\/en\/wp-json\/wp\/v2\/media?parent=4500"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}